PLANNING FOR THE FUTURE "STRATEGIES FOR GROWTH"
Select a site that will allow for future building and parking expansion.
Position your building on the site to allow for potential expansion in the direction that makes the
most sense in terms of internal functions and exterior appearances.
When presenting building plans to zoning and planning boards, indicate on the drawings the potential future additions to the building.
If expansion will occur within five to seven years, design and install original mechanical, electrical, plumbing and fire protection equipment to satisfy the requirements of the future enlarged building.
Consider building additional unfinished shell space that can be quickly finished when needed with
minimal disruption to ongoing operations.
Consider the use of modular building materials, such as precast concrete or insulated
metal panels, that can be removed and then reused on the skin of the building addition
with little waste in material.
Create accessible raceways above the ceiling or in the floor to allow for future expansion
and changes to computer and telephone wiring.
There are many other considerations when planning for future growth, including factors specific to each business. Your design/build general contractor can point out the options and offer cost versus benefit
recommendations. Many growth strategies can be incorporated in your building at minimal impact on the
original construction budget by careful programming and design.
DESIGN/BUILD-AS A METHOD OF CONSTRUCTION DELIVERY
WHAT IS DESIGN/BUILD?
Design/Build is a method of construction delivery in which a single entity performs both the Architectural/Engineering services and the construction work.
In traditional contracting, the Owner commissions an Architect/Engineer to prepare drawings and specifications and then selects a contractor either by negotiation or competitive bidding. This method often takes much longer and results in projects that exceed the budget, only to require redesign. By contrast, using Crown Commercial/Roberts Construction design/build approach combines a designated Architectural/Engineering staff and our general construction management staff to work closely as a team, to produce a product which meets the Owner's needs, rather than simply acting as professional advisors to the Owner.
ADVANTAGES OF DESIGN/BUILD
Crown Commercial/Roberts Construction team approach provides a unique set of advantages not available in any other method of delivery.
- Single Source Responsibility. A single contract is signed between the Owner and Crown Commercial/Roberts Construction who in turn designs the project to meet the Owner's functional and budget requirements; prepares all contract documents and drawings; and executes and manages all trade contracts necessary to complete the project. The Owner looks to a single entity responsible for cost control, schedule adherence and quality assurance.
- By utilizing design/build, the Owner can exercise his design control over the
process with the added advantage of continuously knowing the cost impact of
each decision.
- Time Savings: Long-delivery items are identified and ordered early in the
design process and phased construction is utilized to significantly reduce the
total design-construct time.
- Cost Control During Design: Crown Commercial/Roberts Construction team, working
closely with the Owner, develops a project budget and initial cost estimates
early in the conceptual design state. Continuous estimating throughout the
design process results in firm costs much sooner than the traditional process.
- Cost Savings: Overall costs can be saved through reducing design-
construction time and value engineering.
- Value Engineering is a method of comparing alternative systems based on
initial costs and life cycle costs. This process is ongoing and results in
substitution of materials, design, equipment or systems thereby reducing
the quality.
CONTRACT FORMATS
Crown Commercial/Roberts Construction uses a variety of contract formats in order to tailor a
design/build program that will satisfy our clients. After the schematic phase and
design development phases are completed we propose one of the following contract
formats:
| Open Book - Guaranteed Maximum Price - "GMP" |
|
A fee is agreed upon for Design/Builder's fee overhead and profit
(based on the projected budget) and from our experience and some
preliminary bidding; we develop realistic cost projections for the full scope
of the work. The Owner is given a complete cost breakdown for the
project. A minimum of three bids is then collected from qualified
contractors for each phase of the work. Crown Commercial/Roberts Construction then reviews them
with the Owner and together they select the contractors that represent the
best value. If the combined bids result In a price even lower than the
Guaranteed Maximum, these savings are shared with the Owner. |
| Lump Sum |
|
The Design/Builder provides a stipulated lump sum for design and
construction of the project. All project cost risks and rewards accrue to
the Design/Builder. |
| Cost-Plus Fee |
|
Accurate advance cost estimates are not available for certain types of construction projects. In this case, the Client and Design/Builder agree
upon the design fee and Design/Builder's fee for overhead and profit and
work under cost-plus fee agreement. It is possible for the cost-plus
agreement to be converted to a guaranteed maximum when scope and
cost are to be more exact. |
|